My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-07-09_GENERAL DOCUMENTS - C1981019
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981019
>
2018-07-09_GENERAL DOCUMENTS - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/9/2018 12:42:39 PM
Creation date
7/9/2018 12:41:41 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
General Documents
Doc Date
7/9/2018
Doc Name Note
For (RN7)
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Colowyo Coal Company
Permit Index Doc Type
Findings
Email Name
ZTT
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Proposed Decision and Findings of Compliance July 2018 <br />Permit Renewal No. 7 P a g e | 6 <br />(SHPO) on May 18, 2017 with no adequacy items regarding Colowyo RN-07. <br /> <br />3.3 Status of Permit Revision and Technical Revisions <br /> <br />This section identifies Technical Revisions (TR) processed since the Findings of Permit Renewal <br />No. 6 (May 20, 2013). <br /> <br />TR-99 TR-99 revised Map 45 to indicate that the height of the temporary East Taylor Fill <br />will not be increased; it also added a geotechnical assessment to Exhibit 21, Item <br />1. <br /> <br />TR-100 TR-100 revised Colowyo's mine plan to include highwall mining in the West Pit <br />and South Taylor Pit. <br /> <br />TR-101 TR-101 revised the alignment of the South Taylor haul road south of the West Pit. <br />In addition, the spoil grading plan was updated. <br /> <br />TR-102 TR-102 revised the design for the lower portion of the West Pit Coal Road Ditch, <br />changing the design from trapezoidal to triangular. <br /> <br />TR-103 TR-103 approved additional highwall mining in the South Taylor Pit. This <br />included mining of the E-Seam at the end wall at the south end of the pit. <br /> <br />TR-104 TR-104 approved the construction of a two acre-foot impoundment in the channel <br />of the East Taylor Ditch. <br /> <br />TR-105 TR-105 revised the approved post-mining topography and associated post-mining <br />drainage channels in the East Pit, West Pit and South Taylor Pit. There were no <br />proposed changes to the mine's permitted, affected or disturbed acreages. <br /> <br />TR-106 TR-106 revised the access and haul roads associated with the Collom project. <br /> <br />TR-107 TR-107 approved topsoil haulage and a small area exemption for an area being <br />reclaimed that contained the Lower Administration building near Colowyo's <br />entrance to the mine. <br /> <br />TR-108 TR-108 revised a raw water pipeline alignment from the Wilson Reservoir directly <br />adjacent to the existing raw water pipeline, a temporary facilities area to support <br />development of the Collom Haul Road and Facilities, two new sediment ponds, <br />access roads to support mine development, additional topsoil stockpile locations <br />for the Collom Haul Road, a minimal increase in the permit boundary, a revised <br />disturbance boundary for construction of the Collom Haul Road, an elevated <br />crossing design of Moffat County Road 51 per the request of Moffat County, and a
The URL can be used to link to this page
Your browser does not support the video tag.