Laserfiche WebLink
Daily Report ■ <br /> VLF2 Geomembrane Recertification <br /> 475.0106.026 ■ <br /> April 18,2018 <br /> 3.0 COMMUNICATIONS AND MEETINGS <br /> DRMS and CC&V Environmental Department representatives inspected and investigated the <br /> damage to the geomembrane in the recertification area. DRMS stated that integrity testing of <br /> the existing geomembrane would be required. It was also stated by DRMS that a certification <br /> report would be required for the remediation. <br /> NewFields personnel attended a project pre-shift safety meeting conducted by Ames <br /> Construction. <br /> If you have any questions or require additional information, please contact us at your <br /> convenience. <br /> Sincerely, <br /> NewFields Mining Design &Technical Services <br /> Prepared by: <br /> Benjamin Melly. 817.889.7315 <br /> � F <br /> w' <br /> 4„ <br /> -- <br /> W s <br /> } <br /> Ore Removal <br />