Laserfiche WebLink
i NewFiields <br /> Soluttons <br /> FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek&Victor Gold Mining Company <br /> Project: VLF2 Geomembrane Recertification <br /> NewFields Project Number: 475.0106.026 <br /> Date: April 18, 2018 <br /> S M T W T F S <br /> Temperature: Low: 22°F to High:41°F Weather: Clear <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> Benjamin Melly 10 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> 1.1 Ore Excavation <br /> A CAT D6T LGP dozer was used to remove ore material between the 9650' and 9660' benches, <br /> stockpiling it near the 9650' bench.The D6T worked on a minimum of 2'of geomembrane cover. <br /> The mini excavator was used to excavate test pits locating the geomembrane along the 9660' <br /> elevation. Four test pits were excavated at an approximate interval of ten feet. Damaged <br /> geomembrane was exposed on the south side of the recertification area. <br /> 1.2 Geomembrane Repair <br /> No activities performed during the shift. <br /> 2.0 NEWFIELDS ACTIVITIES <br /> NewFields personnel observed ore removal,geomembrane exposure, and the excavation of test <br /> pits during the shift. <br />