My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-07-05_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2018-07-05_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2021 8:18:55 AM
Creation date
7/6/2018 10:51:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
7/5/2018
Doc Name Note
Subgrade & Geomembrane Evaluations
Doc Name
Construction Quality Assurance Report (CQA)
From
CC&V
To
DRMS
Type & Sequence
TR100
Email Name
TC1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
337
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i NewFiields <br /> Soluttons <br /> FIELD DAILY PROGRESS REPORT <br /> Client: Cripple Creek&Victor Gold Mining Company <br /> Project: VLF2 Geomembrane Recertification <br /> NewFields Project Number: 475.0106.026 <br /> Date: April 18, 2018 <br /> S M T W T F S <br /> Temperature: Low: 22°F to High:41°F Weather: Clear <br /> NEWFIELDS PERSONNEL <br /> Name Hours <br /> Benjamin Melly 10 <br /> 1.0 AMES CONSTRUCTION ACTIVITIES <br /> 1.1 Ore Excavation <br /> A CAT D6T LGP dozer was used to remove ore material between the 9650' and 9660' benches, <br /> stockpiling it near the 9650' bench.The D6T worked on a minimum of 2'of geomembrane cover. <br /> The mini excavator was used to excavate test pits locating the geomembrane along the 9660' <br /> elevation. Four test pits were excavated at an approximate interval of ten feet. Damaged <br /> geomembrane was exposed on the south side of the recertification area. <br /> 1.2 Geomembrane Repair <br /> No activities performed during the shift. <br /> 2.0 NEWFIELDS ACTIVITIES <br /> NewFields personnel observed ore removal,geomembrane exposure, and the excavation of test <br /> pits during the shift. <br />
The URL can be used to link to this page
Your browser does not support the video tag.