Laserfiche WebLink
i. The Division strongly recommends CC&V submit phased certification reports for each of <br /> the components of the liner system(undamaged liner certification; and repair work for: <br /> Soil Liner Fill, Geomembrane,Drain Cover Fill)as the certification by the Colorado <br /> Professional Engineer is completed. This approach should serve to streamline the <br /> process of Division acceptance and minimize potential rework if anomalies are <br /> encountered <br /> CC&V Response: CC&V agrees to submit phased certification reports for each of the <br /> components of the liner system, certified by a Colorado Professional Engineer as they are <br /> completed. After submittal of the phased certification reports, CC&V will move forward with the <br /> repair and construction, addressing any DRMS certification report concerns as necessary. <br /> Enclosed please find the Record of Construction Report VLF2 Recertification Project Subgrade <br /> and Geomembrane 9650' —9750' Elevations. As additional phases of the liner repair are <br /> completed, CC&V will continue to provide the phased certification reports to DRMS <br /> Should you require further information please do not hesitate to contact Justin Bills at <br /> 719.689.4046 or Justin.Bills(a)-newmont.com or myself at 719.689.4055 or <br /> Meg.Burt(a)_newmont.com. <br /> Sincerely, <br /> � P <br /> Meg Burt <br /> Senior Environmental Manager <br /> Cripple Creek and Victor Mining Co <br /> MB/jb <br /> Attachments <br /> ec: T. Cazier— DRMS <br />