Laserfiche WebLink
Greg Lewicki And Associates, i �'�� <br /> 337:5 NY. Powers(circle Phone: (720)842-5321 Fax(303 ,to <br /> Littleton.CO SO123 F mail: info'rr le"vichi.hiz <br /> June 28, 2018 <br /> Lucas West <br /> Colorado Division of Reclamation, Mining, and Safety <br /> 1313 Sherman St, Room 215 <br /> Denver, CO 80203 <br /> Base Products Gravel Pit 1,M-1994-053, 112c Amendment 2 Adequacy Response <br /> Mr. West <br /> Below is a point by point addressing of the adequacy questions posed in your June 8, 2018 letter <br /> to Mr. Doug Flowers about the Base Products Gravel Pit 1. <br /> 1. Exhibit D—Mining Plan <br /> a) The mining plan describes a phased mining approach, with Area I being identified as a <br /> processing area and mining activities proceeding through areas 2-10 and each phase <br /> undergoing contemporaneous reclamation. Please specify the acreages of each phase <br /> for Areas 2-10 and while it is repeated in other exhibits please commit to a total <br /> number of acres disturbed at any given time including the processing areas located in <br /> Area 1. <br /> The table shows an area breakdown. The maximum number of acres to be disturbed at any time <br /> is 21 acres. This is a combination of 16 acres for the processing area and five acres for the active <br /> mining face. <br /> Table I - Phase Area Table <br /> Phase Area(acres) <br /> 1 21 <br /> 2 31.4 <br /> 3 10.3 <br /> 4 9.7 <br /> S 9.6 <br /> 6 8.8 <br /> 7 7.1 <br /> 8 10.1 <br /> 9 8.6 <br /> 10 19.5 <br /> Appelhanz 1 <br />