Laserfiche WebLink
Plan of Operations for El Rancho Bondo <br /> o The area will be maintained as a clean and safe environment by <br /> removing any trash or debris encountered during each visit. High- <br /> walls (not exceeding 6 feet) will be clearly marked. <br /> o During non-operation site conditions will be monitored by visual <br /> inspections on a monthly basis. <br /> o Operations, in one form or another, are anticipated to continue year <br /> round. Periods of non-operation will most likely be intermittent and <br /> should not exceed more than 3 weeks. <br /> • Reclaimation Cost Estimate — 3809.401(D) <br /> o Costs of reclamation are estimated at $400. <br /> ■ Native seed mixture, 40lbs - $80. <br /> ■ Application of straw for erosion control, $70. <br /> • Labor, $250. <br />