Laserfiche WebLink
Plan of Operations for El Rancho Bondo <br /> a <br /> r � e <br /> T _ <br /> -y <br /> Li <br /> • Monitoring Plan Requirements 3809.401(B)(4) <br /> o Erosion will be monitored by visual inspection of the diggings and <br /> trail, the two areas most susceptible to surface erosion. <br /> Susceptible areas are small enough that visual inspections <br /> conducted monthly at a minimum should be sufficient and effective. <br /> • Interim Management plan 3809.401(B)(5) <br /> o Excavation stabilization will be a continuous effort. Overhangs, <br /> loose rock, and loose soil will be removed and/or taken to a state of <br /> lower potential energy so they do not present a hazard. <br /> o Equipment and supplies will be carried in and out daily as a general <br /> rule. <br />