Laserfiche WebLink
3. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and <br /> redistributed for the re-establishment of vegetation. Specify approximate topsoil <br /> redistribution depth: <br /> Ground disturbance is planned to be limited to limited to areas of existing roads, drill <br /> pads, a c. <br /> Topsoil is highly variable in the proposed work area, ranging from not present to tens of <br /> feet thick. <br /> Due to limited surface distu,ba,ice pla,n ed (e.g. usi,ig existing ,oads), 110 tupsuil <br /> stripping or replacement is anticipated. All off-road disturbance will be monitored for <br /> signs of erosion and weeds during operation. <br /> 4. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required <br /> abandonment procedures): <br /> 5. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be <br /> reclaimed (refer to Rule 3 and Rule 5 for specific reclamation performance standards). <br /> You may wish to contact the Division for closure specifications. <br /> N/A <br /> Form 2—Public File Page 9 of 14 <br />