Laserfiche WebLink
6. Describe how roads will be reclaimed or returned to their pre-prospecting (or better) <br /> condition: <br /> Existing roadways and trails will be used during this operation. Their condition will be <br /> mommtored, and Of ruts or other signs of deterioration appear they will be repaired by <br /> placing fill or ensuring proper drainage. No culverts or other structures are anticipated <br /> to be needed. <br /> Hereon proposed work sites Will be left passable as per the , <br /> S wishes as <br /> further work will likely be required based on the results of the proposed exploration <br /> works. <br /> 7. List the seed mixture to be used in the re-establishment of vegetation. See the attached <br /> seed mixture calculation to obtain PLS/acre. For assistance with formulating seed <br /> mixtures and rates, contact the local NRCS if on private land, BLM/USFS if on public <br /> land or State Land Board if on state land. <br /> A. Plant name and seeding rate: <br /> Plant Name Seeding Rate (PLS/Acre) <br /> N/A N/A <br /> Form 2—Public File Page 10 of 14 <br />