Laserfiche WebLink
(2) If the operation is expected to directly affect surface or <br /> groundwater systems,the Operator/Applicant shall: <br /> (a) Locate on the map (in Exhibit Q tributary water <br /> courses, wells, springs, stock water ponds, reservoirs, and <br /> ditches on the affected land and on adjacent lands where <br /> such structures may be affected by the proposed mining <br /> operations; Not Applicable <br /> (b) Identify all known aquifers;and Not Applicable <br /> (c) Submit a brief statement or plan showing how water from <br /> de-watering operations or from runoff from disturbed areas, <br /> piled material and operating surfaces will be managed to <br /> protect against pollution of either surface or groundwater <br /> (and,where applicable,control pollution in a manner that is <br /> consistent with water quality discharge permits), both <br /> during and after theoperation. Not Applicable <br /> (3) The Operator/Applicant shall provide an estimate of the project <br /> water requirements including flow rates and annual volumes for the <br /> development,mining and reclamation phases of the project. <br /> Historical Hay Grass Proposed Bluegrass <br /> Unit Unit 35 Unit Unit 35 <br /> Consumption Demands acres Consumption Demands acres <br /> Month AF/acre AF/acre AF AF/acre AF/acre AF <br /> April 0.02 0.03 0.88 <br /> May 0.12 0.15 5.25 0.09 0.11 3.75 <br /> June 0.24 0.30 10.50 0.38 0.47 16.42 <br /> July 0.31 0.39 13.56 0.41 0.51 17.83 <br /> August 0.26 0.33 11.38 0.33 0.42 14.54 <br /> September 0.13 0.16 5.69 0.21 0.27 +9138 <br /> October 1 0.04 0.05 1.75 <br /> Annual 1.12 1.40 49.00 1.42 1.77 61.93 <br /> (Table based on info from Wright Water Engineers) <br /> The Town owns ample water rights associated with the permit area. Reclamation is the <br /> only part of the process requiring water. An estimated 1.4 acre-feet per acre is required <br /> for the restoration season. Over the 35 acres to be reclaimed with native seeds equates <br /> to a peak monthly demand of approximately 0.25 cfs and an annual demand of 49.0 <br /> acre-feet. <br /> Town of Granby Mining Permit 10 <br />