My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-06-15_REVISION - M2002119
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M2002119
>
2018-06-15_REVISION - M2002119
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:35:27 PM
Creation date
6/15/2018 1:07:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002119
IBM Index Class Name
Revision
Doc Date
6/15/2018
Doc Name
Incompleteness Notice
From
DRMS
To
Elam
Type & Sequence
AM1
Email Name
SJM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of the application, Maps, Introduction and Legal Description to reflect the correct <br />amount of acreage at 31.5 acres. <br />6.4.3 Exhibit C Pre -Mining and Mining Plan Map(s) of the Affected Lands <br />(d) Total area to be involved in the operation, including the area to be mined and the <br />area of affected lands. The map reflects 31.7 acres. It should be 31.5 acres. <br />6.4.4 Exhibit D- Mining Plan <br />The Mining Plan should supply the following information, correlated with the affected <br />lands, maps(s) and timetables <br />(d) Size of area to be worked at any one time. <br />The application states that this information is in Exhibit L. Division Staff could not locate <br />this information. Please submit the amount of area to be worked at any one time. <br />6.4.7 Exhibit G- Water Information <br />(2) If the operation is expected to directly affect surface or groundwater systems, the <br />Operator/Applicant shall locate on map (in Exhibit C)... <br />In Exhibit G narrative, the applicant states that there will be a 25 foot buffer strip/setback <br />near any waterway. In the maps, it states there will be a 50 foot buffer strip/set back. <br />Please clarify if the setback will be 25' or 50' and reflect that in Exhibit G narrative and <br />maps. <br />6.4.19 Exhibit S- Permanent Man -Made Structures <br />Structure Agreements were not found by Division Staff. Please submit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.