Laserfiche WebLink
4 <br /> <br />Trapper Mine: Technical Revision TR119 Prepared by: R. Reilley <br />Date: June 2018 <br /> <br />9. Please indicate if you anticipate requiring a 200 foot buffer past the lease boundary on the 2018 east <br />stripping line at L pit. <br /> <br />Trapper Response: Proposed 2018 stripping included in TR-119 does not encompass nor surpass the current <br />federal lease boundary. A buffer will not be necessary nor is requested with this revision. <br /> <br />June 2018 DRMS <br />Adequate <br /> <br />April 2018 DRMS <br />10. Please clarify if any additional culverts will be associated with the mentioned road and if so, please provide all <br />necessary information to satisfy rule 4.03.1(4 ). <br /> <br />Trapper Response: The routing of the new Life of Mine haul road on the northern perimeter of Nighthawk pit is routed <br />in such a way that it follows a ridgeline and no culverts are planned to be used under it at this time. <br /> <br />June 2018 DRMS <br />Adequate <br /> <br />