Laserfiche WebLink
The topsoil and overburden from newly disturbed areas will be used to reclaim mined out areas. <br /> This will reduce material moving as well as reduce the maximum area to be reclaimed. The <br /> maximum disturbance is discussed in Exhibit L. The expected mining life is discussed below. <br /> No explosives will be used in conjunction with the mining and reclamation operation. <br /> Fetcher vale Pit <br /> May 2018 D-3 - <br />