My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-04-25_PERMIT FILE - C1981038A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981038
>
2018-04-25_PERMIT FILE - C1981038A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2021 11:05:29 AM
Creation date
6/7/2018 7:40:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038A
IBM Index Class Name
Permit File
Doc Date
4/25/2018
Doc Name
Page 56 to 99
Section_Exhibit Name
Volume 1 2.05 Operation and Reclamation Plans Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
§2.05 APPLICATION FOR PERMIT FOR SURFACE OR UNDERGROUND MINING <br />• ACTIVITIES -MINIMUM REQUIREMENTS FOR OPERATION AND <br />RECLAMATION PLANS. <br />2.05.4 Reclamation Plan. <br />(2)(a) (Cont'd) <br />Reclamation of the West Mine water pipeline was completed <br />following construction during the Fall, 1986 and Spring, 1987. <br />Where the pipeline trench was located along a graveled portion of <br />the jeep trail, gravel was replaced over the area. Un-graveled <br />areas were vegetated. <br />II. Final Reclamation and Abandonment Program <br />Interim reclamation was ongoing throughout the life of the West <br />Mine project, as discussed above. Upon completion of mining <br />activities, all equipment, buildings, conveyors, etc. were removed <br />from the landscape. All areas of disturbance were cleaned of <br />debris, graded, and vegetated. Reclamation was conducted in <br />accordance with lease stipulations of the Bureau of Land <br />Management and in compliance with all applicable State and <br />• Federal laws and regulations. <br />The anticipated schedule for final abandonment upon completion <br />of all mining activities will be: <br />1. Complete demolition and disposal of buildings within <br />approximately six months with another six months added for <br />maximum economic recovery; <br />2. Excavation, backfilling, and compaction in two construction <br />seasons; and, <br />3. Approximately three months of final grading, drainage <br />control, and vegetation during the fall of the year to maximize <br />plant growth. A schedule for final abandonment is contained on <br />Figure 2.05-5 in the Final abandonment Appendix, Volume 6A. <br />• <br />TR-48 59 04/08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.