Laserfiche WebLink
5. Describe proposed surface excavation or other land disturbance, including roads, pits, <br />trenches, waste piles, drill pads and collar areas of underground workings, ponds, etc. <br />4 proposed drill sites located on existing roads. No new access roads will be constructed. <br />Approximately thra-e drill he -le -6 aFe planned peF site. M . ' ... . — iber of drill halan 4011 <br />be 12. Drill holes are expected to be between 500' -1,000' in length. Drilling will be <br />wnducted fruni stans four drill sites previously appiuved for Kinross Guld drilling <br />program in_2016. (See attached maps showing intended, existing, access roads and drill <br />sites.) - — <br />6. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, <br />including anticipated number of holes, diameter, depth, location, etc. Submit additional <br />pages if necessary: <br />A. Drill Pads: <br />Average <br />Quantity 4 Width (ft) <br />B. Drill Holes: <br />Quantity 12 <br />C. Mud Pits <br />Quantity 12 <br />50 <br />Average <br />Length (ft) <br />50 <br />Diameter <br />Depth (ft) 1,000 (in) 25 <br />Average Average Average <br />Width (ft) 8.00 Length (ft) 8.00 Depth (ft) 5.00 <br />D. Described proposed underground work, including reopening of old workings, <br />advancement of adits or shafts, trenches, pits, cuts, rock dumps, or other types of <br />disturbance, describe type, quantity and general dimensions: <br />No underground work proposed. The upper roads - above Golden Wonder 3 -Level - will <br />be brushed and water barred where 110oded. <br />Form 2 Public File Page 6 of 14 <br />