My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-06-06_PERMIT FILE - P2018010 (2)
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2018010
>
2018-06-06_PERMIT FILE - P2018010 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2018 3:35:51 PM
Creation date
6/6/2018 3:56:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2018010
IBM Index Class Name
Permit File
Doc Date
6/6/2018
Doc Name
Addendum To Application
From
Kye Abraham
To
DRMS
Email Name
THM
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
II. MAPS & DRAWINGS <br />An accurate topographic base map showing the location of the proposed project must be <br />submitted with this notice. The prospector may submit a U.S.G.S. 7.5 minute quadrangle, or <br />similar map of adequate scale that: <br />1. Identifies the proposed prospecting site(s) or activity areas involving surface <br />disturbance. Activity areas include all drill holes, mud pits, excavations, trenches, adits, <br />shafts, tunnels, rock dumps, stockpiles, impoundments and prospecting roads, and <br />2. Includes sufficient detail to identify and locate known prospecting features and facilities <br />that may be affected and those that are not anticipated to be affected. This includes the <br />location of all drill holes, mud pits, excavations, trenches, adits, shafts, tunnels, rock <br />dumps, stockpiles, impoundments and prospecting roads. Color photographs, <br />adequately labeled (including date, orientation and location), of the prospecting site may <br />be used to fulfill this requirement if included with the NO] submittal. <br />III. PROJECT DESCRIPTION <br />1. Mineral(s) and/or <br />Resource(s) being Gold/Silver <br />Investigated: <br />2. Estimated dates of commencement and Commencement: 09 P1 , 2018 <br />completion: <br />Completion 12 ,31 / 201$ <br />3. Amount of material (specify units) to be / <br />extracted, moved or proposed to be Norte <br />moved: Units <br />Identify the type or method of prospecting proposed and quantity (place an' X') <br />❑ Cuts ❑ Pits ❑ Trenches <br />❑ Shafts <br />❑ Declines <br />❑ Drilling and Blasting <br />❑ Tunnels <br />❑ Air Drilling <br />❑ Adits <br />0 Fluid Drilling <br />Form 2 Public File Page 5 of 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.