May 30, 2018 C-1981-035/King Coal Mine BFB <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 8 <br />Number of Complete Inspections this Fiscal Year: 4 <br /> <br /> Page 2 of 5 <br /> <br /> <br />Inspection Topic Summary <br />NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br />R - Air Resource Protection <br />R - Availability of Records <br />N - Backfill & Grading <br />N - Excess Spoil and Dev. Waste <br />N - Explosives <br />N - Fish & Wildlife <br />R - Hydrologic Balance <br />N - Gen. Compliance With Mine Plan <br />N - Other <br />N - Processing Waste <br /> <br />R - Roads <br />R - Reclamation Success <br />R - Revegetation <br />N - Subsidence <br />N - Slides and Other Damage <br />N - Support Facilities On-site <br />R - Signs and Markers <br />N - Support Facilities Not On-site <br />N - Special Categories Of Mining <br />R - Topsoil <br /> <br />COMMENTS <br /> <br />This was a complete inspection of the King I and II Mines conducted by Brock Bowles of the Colorado Division <br />of Reclamation Mining and Safety. Wade Wymore of GCC Energy was present for the entire inspection. The <br />weather conditions were overcast and warm. The ground was dry and the temperature was approximately 75F. <br />AIR RESOURCE PROTECTION – Rule 4.17: <br /> No fugitive dust was seen. A water truck was spraying the mine roads. <br /> <br />AVAILABILITY OF RECORDS – Rule 5.02.4(1): <br /> All required records were on file and available for review at the mine office. No problems were noted <br />with the records review. Please see the availability of records checklist at the end of this report. <br /> <br />HYDROLOGIC BALANCE - Rule 4.05 <br />Drainage Control 4.05.1, 4.05.2, 4.05.3; Siltation Structures 4.05.5, 4.05.6; Discharge Structures 4.05.7, 4.05.10; <br />Diversions 4.05.4; Effluent Limits 4.05.2; Ground Water Monitoring 4.05.13; Surface Water Monitoring 4.05.13; <br />Drainage – Acid and Toxic Materials 4.05.8; Impoundments 4.05.6, 4.05.9; Stream Buffer Zones 4.05.18: <br /> King II- <br />In the last inspection report, DRMS and GCC searched for a leak with a bore scope in the Pond 1 western spillway <br />pipe. A leak was not found. GCC continued the search and may have found the leak. It appears that a pipe joint <br />separated below the inlet structure where the horizontal pipe leaves the concrete base. GCC has repaired the <br />suspected leak with foam and a tar sealant (photo 1). Pond 1 did not contain water to check the repair. <br />The ditch below the pond 1 outlet pipe (Ditch CWD-1A) has been cleaned (photo 2). <br />The Yard Drop (C9), Substation Drop (C10) and Screen Drop (C8) were free of obstructions. <br />The inlets to culverts C5 (photo 3) and C13 need to be cleaned. <br /> <br />King I - <br />The old culvert that was noted in the East Pond embankment has been sealed with foam to prevent discharge <br />through that pipe. <br />Reach 7 culverts have been cleaned and are clear of obstructions (photo 4).