Laserfiche WebLink
Exhibit 2 WEST ELK MINE GOB GAS GATHERING SYSTEM COSTS <br />WEST ELK MINE O&M <br />Basic Gathering System <br />"E" Seam <br />LABOR <br />Quantity <br />Unit Cost <br />w/30% Load <br />Total cost <br />Sub- Totals <br />Annual Category Totals <br />Comments <br />Supervisor <br />0 <br />100,000 <br />100,000 <br />0 <br />I&E Tech <br />1 <br />80,000 <br />80,000 <br />80,000 <br />Mechanic / Operator <br />1 <br />0 <br />0 <br />0 <br />3 operators for 8 wells is more than a enough <br />Trucks (Field Operators) <br />1 <br />18,000 <br />54,000 <br />18,000 <br />vehicle, leasing, insurance, maintanence, fuel, etc <br />Annual Operating Total <br />98,000 <br />Methanol <br />50,000 <br />3 <br />150,000 <br />150,000 <br />Compression <br />Monthly Rental <br />Working Screw Type <br />6 <br />400 Hp <br />3,000 <br />18,000 <br />18,000 <br />Sealed Screws <br />2 <br />400 Hp <br />3,000 <br />6,000 <br />6,000 <br />Winter Operations <br />Move Screw Compressors <br />11 <br />12,500 <br />0 <br />Move 10" temp poly <br />Measurement/Scada <br /># of Meters <br />Cost/yr/Meter <br />Annual Sub <br />Working ScreCompressors <br />5 <br />10,000 <br />50,000 <br />Sealed Screws <br />2 <br />10,000 <br />20,000 <br />System <br />2 <br />10,000 <br />20,000 <br />Total Measurement Costs <br />90,000 <br />Office expense with 2 clerical personnel <br />Total Project Management <br />TOTAL Annual Costs <br />$ 362,000.00 <br />