Laserfiche WebLink
Exhibit 2 WEST ELK MINE GOB GAS GATHERING SYSTEM COSTS <br />WEST ELK MINE O&M <br />Control System <br />Description <br />Quanity <br />Unit Cost <br />Total cost <br />Sub -Totals <br />Annual Category Totals <br />Comments <br />MATERIAL <br />Chromatograph <br />1 Lot <br />75,000 <br />75,000 <br />Control Valves <br />1 Lot <br />75,000 <br />75,000 <br />Alarm Callout System <br />1 Lot <br />15,000 <br />15,000 <br />SCADA System <br />1 Lot <br />50,000 <br />50,000 <br />Gen Dehydrator <br />1 Lot <br />40,000 <br />40,000 <br />Total Material <br />Monthly Rental <br />255,000 <br />INSTALLATION <br />Chromatagraph <br />1 Lot <br />25,000 <br />25,000 <br />Control Valves/Flare <br />1 Lot <br />50,000 <br />50,000 <br />Gen Dehydrator <br />1 Lot <br />25,000 <br />25,000 <br />SCADA / Alarm System <br />1 Lot <br />50,000 <br />50,000 <br />TOTAL INSTALLATION <br />150,000 <br />TOTAL Control System Costs <br />$ 405,000.00 <br />