Laserfiche WebLink
EXHIBIT E <br /> RECLAMATION PLAN AND TIMETABLE <br /> RECLAMA TION PLAN <br /> The proposed future uses include industrial area, lake area and <br /> rangeland. The Plant Site will continue to be used for indus- <br /> trial purposes when reclamation is done . The lake will need <br /> little reclamation and the remaining newly mined areas that above <br /> water will be revegetated as rangeland. <br /> After mining and reclamation is completed. A quiet lake area <br /> that covers approximately 29 . 32 acres ± will be created when <br /> mining ends (see MAP EXHIBIT F) . Deep Cut plans to use the lake and <br /> surrounding area as a private recreation area and the unmined <br /> portions of the Plant Site as industrial area per the county use <br /> permit . The property will have a variety of grasses planted to <br /> stabilize the soil , reduce erosional damage, enhance the wildlife <br /> habitat, and emphasize the natural beauty of the land. The <br /> landowner may choose to plant trees around the site, but at no <br /> time will we commit to planting trees on the permit area . <br /> If the northeast area is redisturbed, the topsoil\growth medium <br /> salvaged from that area will be placed along the north line on <br /> the setback/perimeter of the mined area. Any growth medium <br /> salvaged from the plant site area will be saved for use on the <br /> lake perimeter in that area. Growth medium will be placed along <br /> the setbacks to minimize the effect of mid-plan stoppage since it <br /> would only have to be pushed onto the above water slopes to <br /> prepare the seed bed. <br /> The mine will be sloped so that stormwater is directed to the <br /> existing lake, that will remain when mining ends . The setbacks <br /> will leave a level area around the lake that will be graded so <br /> any surface water runoff will flow to the property interior and <br /> will be retained on site . This setback will allow access to the <br /> property line and land around the lake for the landowners . When <br /> sloping is complete the side slopes and setback area will be <br /> resoiled and revegetated using the approved seed mixture . The <br /> reclamation timetable shows the amount of land in each reclama- <br /> tion area when complete . <br /> The area to be revegetated will be returned to at least it ' s <br /> present vegetative condition when reclamation is complete, except <br /> in the Plant Site where industrial uses are allowed. This area <br /> 12 <br />