Laserfiche WebLink
East End of the South Berm <br /> Ytong <br /> a '.:. <br /> View looking southwest at the east end of the South Berm. <br /> Final slope will be <br /> 3:1 South Berm South Basin <br /> .a <br /> �o<rev <br /> o <br /> t was <br /> Unreclaimed east end has piled material at top that needs to go over the <br /> north side to bury eroded cut faces. Final slope of the north face will be <br /> 3:1. The south face on other side (not visible) of piled material starts with a <br /> rather low slope that becomes higher to the west. That slope will be <br /> graded to 3:1 as well. Thus cut and fill will be necessary to produce proper <br /> slopes. Grading of west end will match closely with the east end of the <br /> much older part of the South Berm. If more material is needed, it will come <br /> from the North Berm source of soil and overburden. Finally topdress <br /> finished slopes with soil and overburden prior to planting. <br />