My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-05-30_REVISION - M1983035 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1983035
>
2018-05-30_REVISION - M1983035 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:21:09 PM
Creation date
5/30/2018 12:36:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983035
IBM Index Class Name
Revision
Doc Date
5/30/2018
Doc Name
Request for Technical Revision
From
Schmidt Construction Co.
To
DRMS
Type & Sequence
TR4
Email Name
TC1
MAC
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
East End of the South Berm <br /> Ytong <br /> a '.:. <br /> View looking southwest at the east end of the South Berm. <br /> Final slope will be <br /> 3:1 South Berm South Basin <br /> .a <br /> �o<rev <br /> o <br /> t was <br /> Unreclaimed east end has piled material at top that needs to go over the <br /> north side to bury eroded cut faces. Final slope of the north face will be <br /> 3:1. The south face on other side (not visible) of piled material starts with a <br /> rather low slope that becomes higher to the west. That slope will be <br /> graded to 3:1 as well. Thus cut and fill will be necessary to produce proper <br /> slopes. Grading of west end will match closely with the east end of the <br /> much older part of the South Berm. If more material is needed, it will come <br /> from the North Berm source of soil and overburden. Finally topdress <br /> finished slopes with soil and overburden prior to planting. <br />
The URL can be used to link to this page
Your browser does not support the video tag.