My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-05-25_PERMIT FILE - M1995004 (4)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1995004
>
2018-05-25_PERMIT FILE - M1995004 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:35:26 PM
Creation date
5/25/2018 12:31:21 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995004
IBM Index Class Name
Permit File
Doc Date
5/25/2018
Doc Name Note
Amendment
Doc Name
Addendum To Application
From
Grand County
To
DRMS
Type & Sequence
AM1
Email Name
PSH
MAC
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT E RECLAMATION PLAN (CONT) <br /> begins . The stockpiles will be located in areas where <br /> disturbances by ongoing mining operations will be at a minimum, <br /> i .e . , along setbacks on the pit perimeter or on the floor of the <br /> previously mined areas . The topsoil will be handled as little as <br /> possible until it is replaced onto disturbed areas . The operator <br /> will take measures necessary to insure the stability of the <br /> replaced topsoil on graded slopes and spreading it as evenly as <br /> possible . Fertilizer and other soil amendments will be used as <br /> discussed in the original reclamation plan. <br /> AMENDMENT 4 - Revised Reclamation Timetable <br /> RECLAMATION TIMETABLE <br /> Reclamation on the southern slope area is complete and the floor <br /> in that area will begin once enough area on the north end has <br /> been opened so that any reclamation completed will not be <br /> disturbed as mining progresses . This may take 4 or more years <br /> depending on the material demands in the area and the amount of <br /> material mined. Approximately 600 of the total mined land will <br /> be reclaimed by the time mining is completed. Shortly after <br /> mining ends, all grading, resoiling and revegetation will be <br /> completed. The area will then be monitored for success of <br /> revegetation until it is released. The operator estimates that <br /> this will happen 3 to 5 years after mining is completed. <br /> If revegetation problems occur before release, an analysis of the <br /> site will be made and the area will be revegetated again as <br /> necessary. This gives us the most flexibility to complete <br /> reclamation successfully. <br /> This Timetable reflects the areas shown on the Map Exhibit F-Reclamation <br /> Plan Map on the map plat supplied with this amendment . <br /> ACRES f <br /> PHASE YEARS TOTAL REVEGETATION ROADS UNDISTU <br /> RBED <br /> EXISTING 4-6 19.99 13.30 0.00 7.24 <br /> AREA <br /> NEW AREA 4-6 9.62 7.82 0.00 1.25 <br /> TOTALS 29.61 21.12 0.00 8.49 <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.