My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-05-25_INSPECTION - C1981018
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981018
>
2018-05-25_INSPECTION - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/30/2018 9:05:03 AM
Creation date
5/25/2018 10:01:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Inspection
Doc Date
5/25/2018
Doc Name
Inspection Report
From
DRMS
To
Blue Mountain Energy, Inc
Inspection Date
5/22/2018
Email Name
CCW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 22, 2018 C-1981-018/Deserado Mine CCW <br />- The B -Seam Dewatering System #1 was impounding water. Water had reached the last cell in the system. There <br />was no discharge out of the primary spillway. The outlet was clear of debris and capable of functioning as <br />designed. The embankments of the cells were stable and well vegetated. There were no erosional concerns. <br />- The RP- 1 Pond was dry (Photo 2). The outlet to the pond was clear and functional. The embankment was well <br />vegetated and stable. There were no erosional features at the pond. <br />-The RP -2/3 Pond consists of three cells: a west cell, an east cell and amain cell. During the inspection, only the <br />east cell was holding a small amount of water. There was no discharge from the east cell to the main cell. The <br />outlets for all of the cells were clear of debris and capable of functioning as designed. The embankments of the <br />three cells were well vegetated and stable. There were no erosional issues. <br />-The RP -4 pond was dry at the time of the inspection. The outlet was clear and functional. The embankments <br />were stable with no indications of erosion. Vegetation on the embankments was well established. <br />- - The RP -5a Pond was dry during the inspection. The outlet was clear of debris and functional. The <br />embankments were well vegetated and stable. The embankments had no indications of erosion. <br />- There are three ponds located in the main facilities area: the DP -1 Pond (Photo 3), the PP -1 Pond and the PP -2 <br />Pond. The DP -1 pond collects all of the surface runoff from the facilities area. The pond was impounding water. <br />There was no discharge from the pond at the time of the inspection. The outlet was clear and capable of <br />functioning. The embankment was stable and well vegetated. There were no erosional issues. The PP -1 and PP -2 <br />Ponds are associated with the processing plant. Both Ponds were holding water at the time of the inspection. <br />Discharge was not occurring from either pond. The embankments were stable and there were no erosional <br />features. The vegetation on the embankments was well established. <br />- The SDH -3/5 Dewatering System (Photo 4) was running during the inspection. Water from the pump was being <br />impounded in the last cell of the system. The water had reached the primary discharge outlet and was discharging <br />to Red Wash. The embankment was stable and there were no erosional issues. The vegetation on the <br />embankments was establishing well. <br />- The Raw water lagoon was storing water during the inspection. The embankments were well vegetated and <br />stable. There were no indications of erosion. <br />Ditches around the facilities area were mostly dry at the time of the inspection. No down cutting was observed. <br />The ditches were in good condition and capable of functioning as designed. During the spring time the Division <br />recommends that ditches be cleaned as necessary to ensure that water reports to the correct sediment control <br />features. Please continue to clean the facilities ditches as needed. <br />Number of Partial Inspection this Fiscal Year: 8 <br />Number of Complete Inspections this Fiscal Year: 3 <br />Page 3 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.