Laserfiche WebLink
Table D-2—Worst Case Reclamation Costs <br /> Activity Description Time Months Cost $ <br /> Regrade 1500 ft of South Pond perimeter(11,000 cy) using a Cat D-7 <br /> Dozer @$0.43 per c.y. 0.25 $4,730 <br /> Weed Mitii ation 0.1 $1,000 <br /> Topsoil Replacement using D-7 Dozer, 50' push downhill @$0.50/cy <br /> 1532 cy 0.1 $766 <br /> Broadcast seed dryland area @450/ac+ 50%failure =$675 x 1.36 <br /> acres 0.15 $918 <br /> Crimp Mulch all wetland and dryland areas at South Pond perimeter(1.7 <br /> acres) @2000lb/acre @$500/acre 0.1 $850 <br /> Disc topsoil areas prior to seeding @$200 per acre x 1.7 acres 0.1 $340 <br /> Broadcast Seeding of the South Pond wetland area$1000 per acre x <br /> 0.34 acres 0.1 $340 <br /> Totals 0.9 $8,944 <br /> DRMS Costs 21%x direct costs $1,878 <br /> Total Bond Amount $10,822 <br /> Olathe Pit, 2018 <br />