Laserfiche WebLink
the pit floor, and/or distributed to further lower the slopes of unseeded pit slope surfaces at the <br /> time of final reclamation. <br /> By using onsite stockpiled materials and completing reclamation of mined phases concurrent <br /> with active mining, the distance that topsoil and overburden is transported as well as the amount <br /> of material to be rehandled will be minimized. Additionally, the mined and unreclaimed acreage <br /> will be minimized and will make the worst case reclamation area smaller thus decreasing the <br /> required bond. <br /> On occasion, topsoil or overburden may be imported to the site to be used in reclamation. To <br /> ensure that all imported materials are clean and inert the individual or company delivering <br /> material to the facility is required to sign an affidavit certifying that material is clean and inert, <br /> states the original source, and the estimated volume. Additionally, certified inert concrete and <br /> asphalt may be imported to the site and used as the base layers of backfilling. This is <br /> advantageous because inert concrete and asphalt will be used to make up for the limited <br /> overburden expected to be recovered from the site. A blank affidavit of import can be found at <br /> the end of this exhibit. <br /> Garrett Pit c:.cg I ewiclti aaa Ass«iates Pta c' <br /> February 2018 E-2 <br />