Laserfiche WebLink
1. Provide all available Dravo and Continental 1984 construction drawings of the existing <br />screening building and conveyor tube sections <br />2. Provide drawings of existing stoker load out system <br />3. Provide updated profile of the project location <br />4. Provide required drawing of the washplant asbuilt for reject conveyor location <br />5. Provide Allis screen information sheets and drawings <br />6. Provide conveyor component specifications and dimensions <br />7. Provide a soils report in the project area <br />8. Provide all relevant Peabody corporate building specifications <br />9. Provide Belt Analyst conveyor run for the feed conveyor <br />10. Obtain all required permits and approvals. <br />11. Obtain loading system design if required <br />7 <br />