My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-05-14_ENFORCEMENT - M2004031
DRMS
>
Day Forward
>
Enforcement
>
Minerals
>
M2004031
>
2018-05-14_ENFORCEMENT - M2004031
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2018 7:55:42 AM
Creation date
5/15/2018 7:41:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2004031
IBM Index Class Name
Enforcement
Doc Date
5/14/2018
Doc Name Note
Board (MLRB) Order
Doc Name
Board (MLRB) Order
From
DRMS
To
Aggregate Industries - WCR, Inc.
Violation No.
MV2018008
Email Name
JLE
WHE
GRM
AJW
CMM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
was causing flooding of adjacent property owned by Fred Orr. In the Order, the Board <br />imposed two corrective actions: <br />a. Submit a Temporary Groundwater Mounding Mitigation Plan <br />("Temporary Plan") to the Division within thirty (30) days of the <br />effective date of this Order. The Temporary Plan shall be submitted in <br />an approvable form as a Technical Revision. Implementation of that <br />Temporary Plan shall commence within five (5) days of Division's <br />approval of the Technical Revision. <br />b. Submit a Permanent Groundwater Mounding Mitigation Plan <br />("Permanent Plan") to the Division no later than ninety (90) days after <br />the effective date of this Order. The Permanent Plan shall be <br />submitted in an approvable form, as either a Technical Revision or a <br />permit Amendment. Implementation of that Permanent Plan shall <br />commence within thirty (30) days of Division approval. <br />3. The Board also imposed a civil penalty of $108,750, with all but <br />$10,000 suspended if Operator complied with the corrective actions within the <br />required time frames. <br />4. On May 21, 2015, Operator submitted Technical Revision No. 4, which <br />contained the proposed Temporary Pian and water level monitoring plan to verify <br />the effectiveness of the mitigation plan. This plan included a water monitoring <br />regimen which required placement of three monitoring wells (HZMW-2, Ila and <br />11b) and staff gauges for monitoring water levels. <br />5. The Division approved Operator's Technical Revision No. 4 on June 15, <br />2015, and confirmed that the Temporary Plan had been implemented on August 19, <br />2015. <br />6. On December 30, 2015, Operator filed Amendment No. 1 containing a <br />permanent plan that was intended to alleviate the flooding on the Orr property by, <br />among other things, installing a permanent drain ("Orr Drain") to address <br />groundwater mounding and the continued use of staff gauges and use of several <br />monitoring wells, including HZMW-2, lla and llb. <br />7. The Board approved Amendment No. 1 over public objections on <br />November 16, 2016. <br />8. On November 23, 2016, Operator began construction of the Orr Drain. <br />The Orr Drain was not completed until September 22, 2017. <br />Aggregate Industries -- WCR, Inc. <br />M-2004.031 <br />MV -2015-003 and MV -2018-008 <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.