was causing flooding of adjacent property owned by Fred Orr. In the Order, the Board <br />imposed two corrective actions: <br />a. Submit a Temporary Groundwater Mounding Mitigation Plan <br />("Temporary Plan") to the Division within thirty (30) days of the <br />effective date of this Order. The Temporary Plan shall be submitted in <br />an approvable form as a Technical Revision. Implementation of that <br />Temporary Plan shall commence within five (5) days of Division's <br />approval of the Technical Revision. <br />b. Submit a Permanent Groundwater Mounding Mitigation Plan <br />("Permanent Plan") to the Division no later than ninety (90) days after <br />the effective date of this Order. The Permanent Plan shall be <br />submitted in an approvable form, as either a Technical Revision or a <br />permit Amendment. Implementation of that Permanent Plan shall <br />commence within thirty (30) days of Division approval. <br />3. The Board also imposed a civil penalty of $108,750, with all but <br />$10,000 suspended if Operator complied with the corrective actions within the <br />required time frames. <br />4. On May 21, 2015, Operator submitted Technical Revision No. 4, which <br />contained the proposed Temporary Pian and water level monitoring plan to verify <br />the effectiveness of the mitigation plan. This plan included a water monitoring <br />regimen which required placement of three monitoring wells (HZMW-2, Ila and <br />11b) and staff gauges for monitoring water levels. <br />5. The Division approved Operator's Technical Revision No. 4 on June 15, <br />2015, and confirmed that the Temporary Plan had been implemented on August 19, <br />2015. <br />6. On December 30, 2015, Operator filed Amendment No. 1 containing a <br />permanent plan that was intended to alleviate the flooding on the Orr property by, <br />among other things, installing a permanent drain ("Orr Drain") to address <br />groundwater mounding and the continued use of staff gauges and use of several <br />monitoring wells, including HZMW-2, lla and llb. <br />7. The Board approved Amendment No. 1 over public objections on <br />November 16, 2016. <br />8. On November 23, 2016, Operator began construction of the Orr Drain. <br />The Orr Drain was not completed until September 22, 2017. <br />Aggregate Industries -- WCR, Inc. <br />M-2004.031 <br />MV -2015-003 and MV -2018-008 <br />2 <br />