Laserfiche WebLink
ARCADIS <br /> Boring[Well Construction Log <br /> Job Number: Client: Location: Well Number: Page3 Location: <br /> C0001701.0001 Climax Molybdenum Co. Climax Mine ARK-MW-002D of 4 <br /> Drilling Method: Sampling Method: <br /> Air Rotary:ODEX,8.75 in.;Downhole Hammer 7.5 in. Chips Seperated by Cyclone <br /> Drilling Start: 08/26/12 07:45 Develop Start: 08/29/12 07:00 A <br /> Finish: 08/26/12 18:30 Finish: 08/29/12 12:00 ,t <br /> F <br /> o 2s0 <br /> Depth to Water: Drilled By: 5w m <br /> 18.5'bgs Precision Sampling Inc. n <br /> Elevation TOC: N/A Logged By: I I <br /> GL: N/A Matthew W. Bauer, PG UTM:13S 398211,4357521 N <br /> i Well E N y <br /> L C Name Color Description, Remarks <br /> m Construction -a <br /> 0 <br /> Ut <br /> Quartz Monzonite:Quartz monzonite porphyry:quartz and feldspar crystals in an aphanetic matrix,minor <br /> o "XX interbedded,fine grained shale.Formation becoming dry. <br /> --Centralizer 'X <br /> X <br /> X <br /> X <br /> (j7 X <br /> X X <br /> X <br /> X <br /> X <br /> X X <br /> X <br /> X X <br /> O X <br /> X X <br /> X <br /> X X <br /> X <br /> X X <br /> X <br /> X <br /> Ul X <br /> x x <br /> x <br /> x <br /> x <br /> x <br /> 1020 Sand -X <br /> O <br /> x <br /> 20 slot <br /> Sch 40 PVC <br /> Screen X <br /> X X <br /> X <br /> � X <br /> X X Quartz 10YR 4/1 & <br /> —Centralizer X Monzonite 5YR 4/3 <br /> x x <br /> x <br /> _ x <br /> A X <br /> o x <br /> x <br /> x x <br /> x <br /> x <br /> x <br /> _ x <br /> A X <br /> (n X <br /> X <br /> X <br /> X <br /> X X <br /> X <br /> X X <br /> X <br /> O X X <br /> X <br /> X <br /> X <br /> X X <br /> X <br /> X X i <br /> X <br /> Cn X X <br /> X <br /> X X X <br /> X <br /> • X <br /> X X <br /> C3 <br /> Electronic log compiled by:Laura Madsen <br />