Laserfiche WebLink
ARCADIS <br /> Boring/Well Construction Log <br /> Job Number: Client: Location: Well Number: Page2 Location: <br /> C0001701.0001 Climax Molybdenum Co. Climax Mine ARK-MW-002D of 4 <br /> Drilling Method: Sampling Method: <br /> Air Rotary:ODEX,8.75 in.;Downhole Hammer 7.5 in. Chips Seperated by Cyclone <br /> Drilling Start: 08/26/12 07:45 Develop Start: 08/29/12 07:00 <br /> Finish: 08/26/1218:30 Finish: 08/29/1212:00 A <br /> �Fw <br /> Depth to Water: Drilled By: " 2W 5W <br /> 18.5'logs Precision Sampling Inc. n <br /> Elevation TOC: N/A Logged By: /I <br /> GL: N/A Matthew W. Bauer, PG UTM:13S 398211,4357521 N <br /> ti Well E N w <br /> Name Color Description,Remarks <br /> iu Construction j v <br /> cn <br /> O <br /> Sandstone:Sandstone:Arkosic,hard,fine grained and well sorted,primarily composed of quartz,feldspar, <br /> and muscovite mica,minor micritic limestone. Minturn Formation <br /> rn <br /> 0 <br /> Co <br /> 0 <br /> —Centralizer <br /> Sandstone 2.5Y 514 <br /> Co <br /> 0 <br /> OOL <br /> cD <br /> 0 <br /> Centralizer <br /> U1 <br /> O <br /> Electronic log compiled by:Laura Madsen <br />