Laserfiche WebLink
Scraper Worksheet Cont'd Task # 001 Page 1 of 2 <br />SCRAPER TEAM WORK <br />Task description: Replace Topsoil on L Pit - TR119 <br />Site: Trapper Mine Permit Action: TRI 19 Permit/Job#: C1981010 <br />PROJECT IDENTIFICATION <br />Task #: 001 State: Colorado <br />Date: 4/20/2018 County: Moffat <br />User: TNL <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />-Scraper: Cat 637G <br />-Dozer: NA <br />Abbreviation: None <br />Filename: C010-001 <br />COSTShift basis: 1 per day <br />Support Equipment -Load Area: Cat D10T - lOSU <br />-Dump Area: Cat D10T - lOSU <br />Road Maintenance -Motor Grader: CAT 16M <br />-Water Truck: Water Tanker, 2,500 Gal. <br />Cost Breakdown: Scraper Work Team Support Equipment Maintenance Eauimnent <br />Total work team cost/hour: $3,486.45 <br />MATERIAL OUANTITIES <br />Initial volume: 135,520 CCY <br />Loose volume: 135,520 LCY <br />Source of estimated volume: TRI 19; Applic <br />Source of estimated swell factor: Cat Handbook <br />h[11119 ala 9 :211110 Y (1X11 <br />Material weight: <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />NA <br />100 <br />100 <br />100 <br />50 <br />Ownership cost/hour: <br />$152.84 <br />NA <br />$122.17 <br />$122.17 <br />$72.40 <br />$7.88 <br />Operating cost/hour: <br />$158.39 <br />NA <br />$111.29 <br />$111.29 <br />$57.97 <br />$7.37 <br />%Utilization -ripper: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper own. cost/hour: <br />NA <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Ripper op. cost/hour: <br />NA <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$31.26 <br />NA <br />$41.85 <br />$41.85 <br />$28.90 <br />$21.39 <br />Unit Subtotals: <br />$342.49 <br />NA <br />$275.31 <br />$275.31 <br />$159.27 <br />$36.64 <br />Number of Units: <br />8 <br />0 <br />1 <br />1 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$2,739.92 <br />Support: <br />$550.62 <br />Maint: <br />$195.91 <br />Total work team cost/hour: $3,486.45 <br />MATERIAL OUANTITIES <br />Initial volume: 135,520 CCY <br />Loose volume: 135,520 LCY <br />Source of estimated volume: TRI 19; Applic <br />Source of estimated swell factor: Cat Handbook <br />h[11119 ala 9 :211110 Y (1X11 <br />Material weight: <br />2,550 lbs/LCY <br />Material description: <br />Earth - Dry packed <br />Rated Payload: <br />81,600 pounds <br />Payload Capacity: <br />32.00 LCY <br />Swell factor: 1.000 <br />Estimate <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />24.00 <br />LCY <br />Heaped Volume: <br />34.00 <br />LCY <br />Average Volume: <br />29.00 <br />LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />CIRCES Cost Estimating Software <br />