Laserfiche WebLink
SCRAPER TEAM WORK <br />Task description: Haul/Regrade Topsoil to Collom Haul Road: 112+26 - 149+00 <br />Site: Colowyo Coal Mine Permit Action: 13C (TR118) Permit/Job#: C1981019 <br />PROJECT IDENTIFICATION <br />Task #: 007 State: Colorado <br />Date: 3/13/2018 County: Moffat <br />User: ZTT <br />Agency or organization name <br />HOURLY EQUIPMENT <br />DRMS <br />Abbreviation: None <br />Filename: C019-007 <br />COSTShift basis: 1eu r day <br />ption <br />-Scraper: Cat 637G IAL/push-pull <br />-Dozer: NA <br />Support Equipment -Load Area: NA <br />-Dump Area: Cat D1 1T - I IU <br />Road Maintenance —Motor Grader: CAT 16M <br />-Water Truck: Water Tanker, 5,000 Gal. <br />Cost Breakdown' gcrnner Wnrlr Taam 6. ,fi F;',..,....,o.,t a r_:_.______ n___ ____ <br />Total work team cost/hour: $4,511.85 <br />MATERIAL QUANTITIES <br />Initial volume: 37,792 CCY Swell factor: 1.215 <br />Loose volume: 45,917 LCY <br />Source of estimated volume: Table 7 Exh. 1313-T-20 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: 1,600 lbs/LCY <br />Material description: Top Soil <br />Rated Payload: 81,600 pounds <br />Payload Capacity: 51.00 LCY <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />Scraper <br />Dozer <br />Load Area A <br />Dump Area <br />Motor Grader vv <br />WaterTruck <br />%Utilization-machine: <br />100 <br />NA <br />NA <br />75 <br />25 <br />25 <br />Ownership cost/hour: <br />$152.84 <br />NA <br />NA <br />$226.13 <br />$72.40 <br />$24.01 <br />Operating cost/hour: <br />$158.39 <br />NA <br />NA <br />$137.93 <br />$14.49 <br />$8.53 <br />%Utilization -ripper: <br />NA <br />NA <br />NA <br />NA <br />NA <br />NA <br />Ripper own. cost/hour: <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />Ripper op. cost/hour: <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$31.26 <br />NA <br />NA <br />$41.85 <br />$28.90 <br />$0.00 <br />Unit Subtotals: <br />$342.49 <br />NA <br />NA <br />$405.90 <br />$115.79 <br />$32.54 <br />Number of Units: <br />8 1 <br />0 <br />0 <br />4 <br />1 <br />1 <br />Group Subtotals: <br />Work: 1 <br />$2,739.92 <br />Support: <br />$1,623.60 <br />Maint: <br />$148.33 <br />Total work team cost/hour: $4,511.85 <br />MATERIAL QUANTITIES <br />Initial volume: 37,792 CCY Swell factor: 1.215 <br />Loose volume: 45,917 LCY <br />Source of estimated volume: Table 7 Exh. 1313-T-20 <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Material weight: 1,600 lbs/LCY <br />Material description: Top Soil <br />Rated Payload: 81,600 pounds <br />Payload Capacity: 51.00 LCY <br />Scraper Bowl (volume) Basis: <br />Struck Volume: <br />24.00 <br />LCY <br />Heaped Volume: <br />34.00 <br />LCY <br />Average Volume: <br />29.00 <br />LCY <br />Adjusted Capacity: <br />29.00 <br />LCY <br />