Laserfiche WebLink
Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />1.00 Minutes <br />0.60 Minutes <br />Scraper Push Dozer Source <br />Altitude Adj: 1.000 NA (CAT HB) <br />Job Efficiency: 0.830 NA (CAT HB) <br />Net Correction: 0.830 NA <br />Travel Time: <br />Road Condition: Hard, smooth, stabilized, surfaced watered maintained 2.0 <br />Haul Route - <br />Site Altitude: 7500 feet <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />Roll. Res <br />Total Res <br />Velocity <br />f m <br />Travel Time <br />(min) <br />1 <br />5093.00 <br />4.60 <br />2.00 <br />6.60 <br />1362 <br />3.81 <br />Haul Time: 3.81 minutes <br />Return Rnrnte- <br />Seg # <br />Haul Distance (Ft) <br />Grade <br />%) <br />Roll. Res <br />% <br />Total Res <br />%) <br />Velocity <br />(fpm) <br />Travel Time <br />(min) <br />1 <br />5093.00 <br />-4.60 <br />2.00 <br />-2.60 <br />2972 <br />1.77 <br />Return Time: <br />1.77 <br />minutes <br />Total Scraper team cycle time: <br />7.18 <br />minutes <br />Adjusted for job conditions: <br />402.28 <br />LCY/Hour <br />Selected Number of Scrapers: <br />2 <br />Scraper(s) <br />Adjusted single scraper team (unit) hourly production: <br />402.28 <br />LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: <br />1,609.14 <br />LCY/Hour <br />Unadjusted unit production/hour: 484.68 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 4 Team(s) Total job time: 204.35 Hours <br />Unit cost: $2.758 /LCY Total job cost: $906,975 <br />