Laserfiche WebLink
2018 Arnold Pit 112 <br />2. will comply. <br />3. will comply. <br />vii. 3.1.7 Groundwater— Specific Requirements <br />1. this operation is not expected to directly affect groundwater <br />systems. <br />2. 2-9 noted. <br />viii. 3.1.8 Wildlife <br />1. see Exhibit 3.1.8 Parks and Wildlife pgs l and 2; letters <br />from Colorado Parks and Wildlife <br />2. see Exhibit 3.1.8 Parks and Wildlife pgs 1 and 2; letters <br />from Colorado Parks and Wildlife <br />ix. 3.1.9 Topsoiling <br />1. Will comply. <br />2. 2-8 will be followed as needed <br />x. 3.1.10 Revegetation <br />1. 1-9 will be followed as they pertain to rangeland <br />reclamation. <br />xi. 3. 1.11 Building and Structures <br />1. noted <br />xii. 3.1.12 Signs and Markers <br />1. Will comply. <br />xiii_ 3.1.13 Spill Reporting <br />1. will comply, spills will be reported as required. <br />d. Revegetation etc -- revegation will be rangeland seed mix. revegetation <br />will consist of reseeding the reclaimed areas using a rangeland seed mi <br />e. Reclamation implementation <br />i. Estimated time for each stage — the entire excavation of the site <br />should take appy. 20 years from the day of commencement. The <br />reclamation should start within 4 years of the ceasing of mining <br />activities and should be completed within 5 years. We're <br />anticipating the stripping phase will commence in 20I8. Estimated <br />time for each phase will depend on material demand but the <br />stripping phase should take app 3 weeks, the processing app I '•z <br />months and the hauling app 2 months. <br />ii. Description of size and location of area to be reclaimed <br />description of size is the areas that have been mined and are <br />located such that once reclaimed, there is minimal chance that <br />mining operations will have an adverse effect on the reclaimed <br />areas. <br />iii. Outline of sequence of reclamation stages — we'll place the top soil <br />on the surface to be reclaimed. Once weather and climate <br />conditions are satisfactory for revegetation (usually between Nov 1 <br />and May 30), it will commence. <br />f Description of each of the following — <br />,knoll Pit Paw 4 of23 <br />