My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-04-24_PERMIT FILE - M2018019
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2018019
>
2018-04-24_PERMIT FILE - M2018019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2018 3:00:00 PM
Creation date
4/25/2018 2:51:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2018019
IBM Index Class Name
Permit File
Doc Date
4/24/2018
Doc Name Note
Application
Doc Name
Application
From
Las Animas County
To
DRMS
Email Name
MAC
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2018 Arnold Pit 112 <br />f. <br />take app 3 weeks, the processing app 1 '- months and the hauling app 2 <br />months. <br />i. Nature, depth and thickness of deposits to be mined and type of overburden <br />- nature of the product is rock to be processed into road base, depth varies <br />from appr. 6" to appr. 20', overburden thickness varies from appy. 6" to <br />appr. 5'. The type of overburden to be removed is a rock and dirt mix. <br />ii. Nature of the stratum immediately beneath - nature of stratum appears to be <br />sand. <br />g. Primary and secondary commodities - primary commodity is road base; intended <br />use: road base for County Roads. Secondary product, if encountered, is big rock; <br />intended use: may be used for rip rap and other County Road right of way repairs. <br />h. Name and describe all incidental products - no incidental products are expected. <br />i. Specify if explosives will be used - explosives will not be used. <br />6.4.5 EXHIBIT E - Reclamation Plan <br />1. see below <br />a. type of reclamation - type will be placing prior excavated materials onto <br />excavated sites followed by the placement of topsoil, then seeding. Chosen <br />because it's the most feasible. <br />b. the pit will be reclaimed to a rangeland use, the same as the other land <br />uses in the vicinity <br />c. description of how the Reclamation Plan will be implemented - <br />i. 3.1.1 (1) The affected lands will be reclaimed as rangeland. <br />ii. 3.1.2 not applicable. <br />iii. 3.1.3 will comply. <br />iv. 3.1.4 not applicable. <br />v. 3.1.5 Reclamation Measures - Materials Handling <br />1. final slopes will not be steeper than 3:1. <br />2. will comply. <br />3. will comply. <br />4. will comply. <br />5. no refuse and acid forming or toxic materials should be <br />mined <br />6. no drill or auger holes should be used <br />7. finished slopes will be no steeper than 3:1 except in areas <br />where no mining activities will take place (naturally <br />existing slopes). <br />8. finished use is rangeland. <br />9. no structural materials will be used to backfill <br />10. will comply. <br />11. will comply. <br />vi. 3.1.6 Water - General Requirements <br />1. will comply. <br />ATnold Pit Paue 3 of 23 <br />
The URL can be used to link to this page
Your browser does not support the video tag.