Laserfiche WebLink
2018 Arnold Pit 112 <br />f. <br />take app 3 weeks, the processing app 1 '- months and the hauling app 2 <br />months. <br />i. Nature, depth and thickness of deposits to be mined and type of overburden <br />- nature of the product is rock to be processed into road base, depth varies <br />from appr. 6" to appr. 20', overburden thickness varies from appy. 6" to <br />appr. 5'. The type of overburden to be removed is a rock and dirt mix. <br />ii. Nature of the stratum immediately beneath - nature of stratum appears to be <br />sand. <br />g. Primary and secondary commodities - primary commodity is road base; intended <br />use: road base for County Roads. Secondary product, if encountered, is big rock; <br />intended use: may be used for rip rap and other County Road right of way repairs. <br />h. Name and describe all incidental products - no incidental products are expected. <br />i. Specify if explosives will be used - explosives will not be used. <br />6.4.5 EXHIBIT E - Reclamation Plan <br />1. see below <br />a. type of reclamation - type will be placing prior excavated materials onto <br />excavated sites followed by the placement of topsoil, then seeding. Chosen <br />because it's the most feasible. <br />b. the pit will be reclaimed to a rangeland use, the same as the other land <br />uses in the vicinity <br />c. description of how the Reclamation Plan will be implemented - <br />i. 3.1.1 (1) The affected lands will be reclaimed as rangeland. <br />ii. 3.1.2 not applicable. <br />iii. 3.1.3 will comply. <br />iv. 3.1.4 not applicable. <br />v. 3.1.5 Reclamation Measures - Materials Handling <br />1. final slopes will not be steeper than 3:1. <br />2. will comply. <br />3. will comply. <br />4. will comply. <br />5. no refuse and acid forming or toxic materials should be <br />mined <br />6. no drill or auger holes should be used <br />7. finished slopes will be no steeper than 3:1 except in areas <br />where no mining activities will take place (naturally <br />existing slopes). <br />8. finished use is rangeland. <br />9. no structural materials will be used to backfill <br />10. will comply. <br />11. will comply. <br />vi. 3.1.6 Water - General Requirements <br />1. will comply. <br />ATnold Pit Paue 3 of 23 <br />