My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-04-02_PERMIT FILE - C1981019A (5)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2018-04-02_PERMIT FILE - C1981019A (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2018 6:29:30 AM
Creation date
4/25/2018 8:44:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
4/2/2018
Doc Name
Pages EX13A-TO-1 to EX13A-T18B-2
Section_Exhibit Name
Exhibit 13A Reclamation Cost Estimate
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
547
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 156 of 394 <br />Truck Bed (volume) Basis: <br />Struck Volume: <br />153.00 <br />LCY <br />Heaped Volume: <br />192.00 <br />LCY <br />Average Volume: <br />172.50 <br />LCY <br />Adjusted Volume: <br />192.00 <br />LCY <br />Final Truck Volume Based on Number of Loader Passes: 174.90 <br />Loading Tool Capacity <br />Bucket Size Class: NA <br />Rated Capacity: 53.000 LCY (heaped) <br />Bucket Fill Factor: 1.100 Other - rock/dirt mixtures (100-120%)1.100 <br />Adjusted Capacity: 58.300 LCY <br />Job Condition Corrections: Site Altitude (ft.): 7600 feet <br />Truck Loader Source <br />Altitude Ad': 1.000 0.980 (CAT HB) <br />Job Efficiency: 0.830 0.830 (CAT HB <br />Net Correction: 0.830 0.813 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill <br />Excavators and Front Shovels: Truck: <br />Machine Cycle Time vs. Job Condition Rating: NA <br />Selected Value within this Basic Rating: NA <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.100 <br />Wheel and Track Loaders - Unadjusted Basic Loader C cle Time (load dum <br />3 <br />J Y f p° 0.725 <br />maneuver)- <br />Cycle <br />aneuver): <br />LCY <br />passes <br />minutes <br />C cle Time Factors <br />Minutes <br />Factor min. <br />Source <br />Material: <br />Material 3/4" to 6" diameter 0.00 <br />0.000 <br />Cat HB <br />Stockpile: <br />Conveyor or dozer piled 10 ft. high and up <br />0.000 <br />(Cat HB) <br />0.00 <br />Truck Ownership: <br />Common ownership of trucks and loaders - <br />-0.040 <br />(Cat HB) <br />0.04 <br />Operation: <br />Constant operation -0.04 <br />-0.040 <br />Cat HB <br />Dump Target: <br />Nominal target 0.00 <br />0.000 <br />(Cat HB) <br />Truck Cycle Time: <br />Truck Exchange Time: <br />Truck Load Time: <br />Truck Maneuver and Dump <br />Time: <br />Truck Travel (Haul & Return) Time: <br />maintained 3.0 <br />Net Cycle Time Adjustment: -U.UBU minutes <br />Adjusted Loader Cycle Time: 0.645 minutes <br />Net Load Time per Truck: 1.390 minutes <br />0.80 <br />Minutes <br />1.390 <br />Minutes <br />1.20 <br />Minutes <br />Adjusted for site altitude: <br />0.800 <br />Minutes <br />Adjusted for site altitude: <br />1.418 <br />Minutes <br />Adjusted for site altitude: <br />1.200 <br />Minutes <br />Road Condition: Firm, smooth, rolling, dirt/It. surfaced, watered, <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.