Laserfiche WebLink
Task description: Haul Tc <br />Site: Colowyo Coal Mine <br />PROJECT IDENTIFICATION <br />TRUCK/LOADER TEAM WORK <br />from Pile 16A to West Pit <br />Permit Action: MT7 <br />Task #: 117 State: Colorado <br />Date: 4/7/2016 County: Moffat <br />User: JHB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Truck Loader Team -Truck: <br />-Loader: <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance -Motor Grader: <br />-Water Truck: <br />Cost Breakdown: Truck/Loader Team <br />Eauinment Description <br />Page 155 of 394 <br />Permit/Job#: C1981019 <br />Abbreviation: None <br />Filename: CO 19-117 <br />Shift basis: 1 per day <br />KOMATSU 830E <br />LETOURNEAU L2350 <br />Cat DI IT - I IU <br />Cat D11T - I IU <br />CAT 16M <br />Water Tanker, 14,000 Gal. <br />Sunnort Fauinment <br />Maintenance Fauinment <br />Total work team costihour: $7.583.76 <br />MATERIAL OUANTITIES <br />Initial volume: 99,577 CCY Swell factor: 1.000 <br />Loose volume: 99,577 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor <br />Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />100 <br />100 <br />100 <br />50 <br />50 <br />Ownership cost/hour: <br />$114.21 <br />$344.26 <br />$177.24 <br />$177.24 <br />$75.59 <br />$64.74 <br />Operating cost/hour: <br />$270.80 <br />$506.11 <br />$291.79 <br />$291.79 <br />$42.64 <br />$67.43 <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Operator cost/hour: <br />$22.10 <br />$38.60 <br />$38.89 <br />$38.89 <br />$35.83 <br />$29.42 <br />Unit Subtotals: <br />$407.11 <br />$888.97 <br />$507.92 <br />$507.92 <br />$154.06 <br />$161.58 <br />Number of Units: <br />6 <br />2 <br />2 <br />4 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$4,220.60 <br />Support: <br />$3,047.52 <br />Maint: <br />$315.64 <br />Total work team costihour: $7.583.76 <br />MATERIAL OUANTITIES <br />Initial volume: 99,577 CCY Swell factor: 1.000 <br />Loose volume: 99,577 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: <br />2,550 Pounds/LCY <br />Description: <br />Earth - Dry packed <br />Rated Payload: <br />492,200 Pounds <br />Payload Capacity: <br />193.02 LCY <br />CIRCES Cost Estimating Software <br />