Laserfiche WebLink
April 12, 2018 C-1981-008/New Horizon Mine BFB <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 7 <br />Number of Complete Inspections this Fiscal Year: 3 <br /> <br /> Page 3 of 3 <br /> <br />TOPSOIL – Rule 4.06 <br />Removal 4.06.2; Substitute Materials 4.06.4(4); Storage and Protection 4.06.3; Redistribution 4.06.4: <br /> Morgans were repairing a low spot in the field along the BB Road. The A horizon was pushed aside and <br />B horizon was being replaced (photo 4). Soil was not being moved during the inspection due to high winds and <br />dusty conditions. <br /> <br />ENFORCEMENT ACTIONS/COMPLIANCE <br /> <br />No enforcement actions were initiated as a result of this inspection, nor are any pending. <br /> <br />PHOTOGRAPHS <br /> <br /> Photo 1 – Pond 9 Primary Spillway Photo 2 – Pond 16 <br /> Photo 3 – Erosion Wattles Along BB Road Photo 4 – Topsoil Repair on Morgan Property