Laserfiche WebLink
4.0 REQUIRED PLANT IMPROVEMENTS <br /> The Professional Engineer's certification of this plan is contingent on the following improvements <br /> being implemented for compliance with the SPCC Regulations: <br /> 1. Each time the plant is relocated, the Plant Manager locates the plant within a depression <br /> area (on relatively impermeable soils and out of the floodplain to the extent possible); <br /> 2. Diesel and asphalt cement tanks are located within a compacted earthen berm containing <br /> either a minimum of 15% clay passing the No. 200 sieve, or lined with an impermeable, <br /> visqueen-type liner to prevent infiltration of oil into the subsurface; <br /> 3. Locks are installed on the drain outlets for each tank and on the office trailer to prevent <br /> access to tools, plant and generator controls, and miscellaneous oils and chemicals; <br /> 4. Locks are installed on the 10,000 gallon diesel tank dispensers; <br /> 5. Obtain and maintain spill clean-up equipment to be located in the parts storage/office <br /> trailer. <br /> Portable Gencor Asphalt Plant Page 13 <br /> SPCC Plan August 31, 2005 <br />