Laserfiche WebLink
If the installation stops operations in response to a fire, explosion, emission, or discharge, the <br /> Rant Manager or Spill Prevention Designee must ensure that adequate monitoring is <br /> conducted for leaks, pressure buildup, gas generation, or ruptures in valves, pipes, or other <br /> equipment, wherever this is appropriate. <br /> The Plant Manager or Spill Prevention Designee must insure that in the affected areas of the <br /> installation, no material or waste incompatible with the emitted or discharged residues is <br /> processed, stored, treated, or disposed of until cleanup procedures are completed; and, all <br /> emergency equipment listed in the plan is cleaned and replaced for its intended use before <br /> operations are resumed. <br /> Portable Gencor Asphalt Plant Page 11 <br /> SPCC Plan August 31, 2005 <br />