My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-04-22_REPORT - M2018015
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2018015
>
2018-04-22_REPORT - M2018015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2018 3:33:32 PM
Creation date
4/23/2018 2:17:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2018015
IBM Index Class Name
REPORT
Doc Date
4/22/2018
Doc Name Note
Adequacy Review Response
Doc Name
Adequacy Review Response
From
Fremont Paving and Redi-Mix, Inc.
To
DRMS
Email Name
LJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.3 Portable Plant Description <br /> 1.3.1 Portable Plant Operations Description <br /> This portable hot mix asphalt plant, referred to as the Gencor Asphalt Plant, is owned and <br /> operated by A&S Construction Company. The Gencor Asphalt Plant consists of the plant <br /> with aggregate bins, asphalt cement tanks, diesel tanks, and a generator trailer. <br /> Oil products used for this portable plant include diesel fuel, burner fuel, asphalt cement, and <br /> heat transfer oil. <br /> The Gencor Asphalt Plant is relocated to various job locations as required by the project. <br /> Typically, the plant may remain on the location for four to six weeks, although longer <br /> durations are possible. Although the listed equipment is commonly used in the plant, the <br /> equipment may change from time to time as necessitated by varying operation and <br /> maintenance requirements. The equipment could have varying tank sizes; it is the Plant <br /> Manager's responsibility to determine the required secondary containment volumes if the <br /> equipment is changed. <br /> This portable plant is typically operated up to 12 hours per day by 3 operators. <br /> 1.3.2 Drainage Pathway and Distance to Waterways <br /> This section should describe the facility's proximity to bays, rivers, streams (perennial or intermittent), <br /> creeks, ditches, flood control channels, storm drains and other waterways. Hydrologic systems should <br /> be diagrammed or described. <br /> The Gencor Asphalt Plant is a portable plant; therefore, the proximity to waterways will <br /> change for each new location of this plant. The Plant Manager(s)will minimize the possibility <br /> of discharge of potential oil spills to waterways by locating the plant or oil containing portions <br /> of the plant in an existing depression area or creating a depression prior to setting up the <br /> portable plant. <br /> Portable Gencor Asphalt Plant Page 2 <br /> SPCC Plan August 31, 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.