Laserfiche WebLink
MANAGEMENT APPROVAL AND REVIEW <br /> In accordance with 40 CFR 112.5(b), a review and evaluation of this SPCC Plan is required at <br /> least once every five years. <br /> If required, as a result of the five-year review and evaluation, A & S Construction Co. will amend <br /> the SPCC Plan within six months of the review to include more effective prevention and control <br /> technology if: (1) such technology will significantly reduce the likelihood of a spill event from the <br /> facility; and (2) if such technology has been field-proven at the time of review. A Professional <br /> Engineer shall certify any technical amendment to the SPCC Plan. <br /> "I have completed review and evaluation of the SPCC Plan for the Gencor Portable Asphalt <br /> Plant and will/will not amend the Plan as a result:" <br /> Review Date Signature Amendment Type PE Certified? (Y/N, <br /> (None, Admin, Date) <br /> Technical) <br /> MANAGEMENT APPROVAL <br /> A & S Construction Co. is committed to the prevention of discharges of oil to navigable waters <br /> and the environment, and will maintain the highest standards for spill prevention control and <br /> countermeasures through regular review, updating, and implementation of this Spill Prevention <br /> Control and Countermeasure Plan for the Gencor Asphalt Plant. <br /> Authorized Facility Representative: p oLh J't,y <br /> Signature: ,� <br /> Date: <br /> Portable Gencor Asphalt Plant Page <br /> SPCC Plan August 31, 2005 <br />