My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-04-22_REPORT - M2018015
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2018015
>
2018-04-22_REPORT - M2018015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2018 3:33:32 PM
Creation date
4/23/2018 2:17:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2018015
IBM Index Class Name
REPORT
Doc Date
4/22/2018
Doc Name Note
Adequacy Review Response
Doc Name
Adequacy Review Response
From
Fremont Paving and Redi-Mix, Inc.
To
DRMS
Email Name
LJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MANAGEMENT APPROVAL AND REVIEW <br /> In accordance with 40 CFR 112.5(b), a review and evaluation of this SPCC Plan is required at <br /> least once every five years. <br /> If required, as a result of the five-year review and evaluation, A & S Construction Co. will amend <br /> the SPCC Plan within six months of the review to include more effective prevention and control <br /> technology if: (1) such technology will significantly reduce the likelihood of a spill event from the <br /> facility; and (2) if such technology has been field-proven at the time of review. A Professional <br /> Engineer shall certify any technical amendment to the SPCC Plan. <br /> "I have completed review and evaluation of the SPCC Plan for the Gencor Portable Asphalt <br /> Plant and will/will not amend the Plan as a result:" <br /> Review Date Signature Amendment Type PE Certified? (Y/N, <br /> (None, Admin, Date) <br /> Technical) <br /> MANAGEMENT APPROVAL <br /> A & S Construction Co. is committed to the prevention of discharges of oil to navigable waters <br /> and the environment, and will maintain the highest standards for spill prevention control and <br /> countermeasures through regular review, updating, and implementation of this Spill Prevention <br /> Control and Countermeasure Plan for the Gencor Asphalt Plant. <br /> Authorized Facility Representative: p oLh J't,y <br /> Signature: ,� <br /> Date: <br /> Portable Gencor Asphalt Plant Page <br /> SPCC Plan August 31, 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.