My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018-04-22_REPORT - M2018015
DRMS
>
Day Forward
>
Report
>
Minerals
>
M2018015
>
2018-04-22_REPORT - M2018015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2018 3:33:32 PM
Creation date
4/23/2018 2:17:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2018015
IBM Index Class Name
REPORT
Doc Date
4/22/2018
Doc Name Note
Adequacy Review Response
Doc Name
Adequacy Review Response
From
Fremont Paving and Redi-Mix, Inc.
To
DRMS
Email Name
LJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
75
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE OF CONTENTS <br /> MANAGEMENT APPROVAL AND REVIEW II <br /> PROFESSIONAL ENGINEER'S REVIEW III <br /> 1.0 INTRODUCTION 1 <br /> 1 1 REGULATORY INFORMATION 1 <br /> 1.1.1 Purpose . 1 <br /> 1.2 PORTABLE PLANT INFORMATION 1 <br /> 1.2 1 Portable Plant Owner Address and Telephone . 1 <br /> 1 2.2 Portable Plant Contacts 1 <br /> 1 3 PORTABLE PLANT DESCRIPTION 2 <br /> 1.3.1 Portable Plant Operations Description 2 <br /> 1 3.2 Drainage Pathway and Distance to Navigable Waters 2 <br /> 2.0 POTENTIAL SPILL SOURCES 3 <br /> 2 1 FACILITY STORAGE 3 <br /> 2.2 SPILL HISTORY 4 <br /> 2.3 POTENTIAL SPILL PREDICTIONS, VOLUMES, RATES AND CONTROL 4 <br /> 3.0 SPILL PREVENTION AND RESPONSE 5 <br /> 3.1 DISCHARGE PREVENTION 5 <br /> 3.1.1 Spill Control Equipment 5 <br /> 3.1.2 Secondary Containment 5 <br /> 3.1.3 Drainage Control 6 <br /> 3.1.4 Bulk Storage Tanks 6 <br /> 3.1.5 Inspections and Recordkeeping 7 <br /> 3.1.6 Personnel Training and Accountability 8 <br /> 3.1.7 Security 8 <br /> 3.2 SPILL RESPONSE AND NOTIFICATION 10 <br /> 3.2.1 Spill Reporting 10 <br /> 3.2.2 Emergency Telephone Numbers 12 <br /> 4.0 REQUIRED PLANT IMPROVEMENTS 13 <br /> 5.0 CONTINGENCY PLANS [112.7(D)] 14 <br /> 5.1 PURPOSE OF PLAN AND COMMITMENT OF RESOURCES 14 <br /> 5.2 SCOPE 14 <br /> 5.3 RESPONSIBILITIES, ORGANIZATION, AND DUTIES 14 <br /> 5.4 TRAINING 14 <br /> 5.5 ROUTINE SURVEILLANCE TO DETECT POTENTIAL HAZARDS - - 15 <br /> 5.6 EMERGENCY PROCEDURES 15 <br /> APPENDIX 1: SITE LAYOUT 16 <br /> APPENDIX 2: MONTHLY ABOVEGROUND STORAGE TANK(AST)INSPECTION REPORT 17 <br /> APPENDIX 3: MONTHLY PLANT AREA INSPECTION REPORT AND CHECKLIST 18 <br /> APPENDIX 4: DRAINAGE DISCHARGE REPORT FORM 19 <br /> APPENDIX 5: RECORD OF TRAINING SESSION 20 <br /> APPENDIX 6: SPILL REPORTING FORM 21 <br /> APPENDIX 7: CERTIFICATION OF THE APPLICABILITY OF THE SUBSTANTIAL HARM CRITERIA CHECKLIST 22 <br /> Portable Gencor Asphalt Plant Page i <br /> SPCC Plan August 31, 2005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.