April 12, 2018 C-1981-038/Bowie No. 1 Mine JHB <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 9 <br />Number of Complete Inspections this Fiscal Year: 3 <br /> <br /> Page 2 of 4 <br /> <br /> <br />Inspection Topic Summary <br />NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br />Y - Air Resource Protection <br />N - Availability of Records <br />Y - Backfill & Grading <br />N - Excess Spoil and Dev. Waste <br />NA - Explosives <br />Y - Fish & Wildlife <br />R - Hydrologic Balance <br />Y - Gen. Compliance With Mine Plan <br />N - Other <br />N - Processing Waste <br /> <br />R - Roads <br />R - Reclamation Success <br />R - Revegetation <br />N - Subsidence <br />Y - Slides and Other Damage <br />R - Support Facilities On-site <br />R - Signs and Markers <br />N - Support Facilities Not On-site <br />N - Special Categories Of Mining <br />N - Topsoil <br /> <br /> <br />COMMENTS <br /> <br />This was a partial inspection conducted by Janet Binns and Clayton Wein of DRMS. Mr. Basil Bear of Bowie <br />Resources met the inspectors at the Load out site. The weather was cloudy and extremely windy. A spring storm <br />was predicted to blow in within the next 24 hours. <br /> <br />The Bowie No. 1 Mine consists of a rail loadout that is in various stages of clean up, The reclaimed ROM area, the <br />reclaimed East Mine, and the reclaimed West Mine. <br />HYDROLOGIC BALANCE - Rule 4.05 <br />Drainage Control 4.05.1, 4.05.2, 4.05.3; Siltation Structures 4.05.5, 4.05.6; Discharge Structures 4.05.7, 4.05.10; <br />Diversions 4.05.4; Impoundments 4.05.6, 4.05.9; Stream Buffer Zones 4.05.18: <br /> Irrigation ditches in and adjacent to the Load out were flowing. The irrigation ditches appear to be <br />functioning well. The upland diversion ditch located north of the Sediment pond on the north east side of the load <br />out, had a slow seep that is caught in the sediment pond. The sediment pond was dry with the exception of the <br />small puddle from the seep. Basil indicated that he would continue to try to seal the ditch to keep the water from <br />seeping into the pond. <br /> <br />The collection ditches at the load out are dry and free of debris. <br /> <br />ROADS – Rule 4.03 <br />Drainage 4.03.1(4)/4.03.2(4) <br />Surfacing and Maintenance4.03.1(5) and (6)/4.03.2(5) and (6) <br />Reclamation 4.03.1(7)/4.03.2(7): <br /> The roads through the Load out were in good condition and graded. The rails, and much of the gravel <br />ballast has been removed from the rail line at the load out. <br /> <br />Most of the roads at the reclaimed mine areas have previously been reclaimed. The access road at the East mine <br />was drivable, though rocks were present throughout the road. The inspectors did not drive to the upper bench at