Laserfiche WebLink
Expected annual average production is 1 million tons; actual production rates will fluctuate <br /> based on market conditions. Raw material will be sold as various products: crushed rock, chips, <br /> road base, concrete, and asphalt. A breakdown of the anticipated product tonnages and mined <br /> tonnages can be seen in Table D-1. Both topsoil and overburden may be sold onsite on an as <br /> needed basis; however, Douglas Mountain Ranch commits to retaining enough material for <br /> preferential onsite reclamation use. Quantities of topsoil and overburden sold are secondary <br /> commodities and,therefore, are not included in the table below or the annual tonnage total sold <br /> from the site. <br /> No pit dewatering will take place, as the groundwater table is well below the bottom of the pit <br /> elevation shown on Map C-2.No groundwater will be exposed; however, if it is encountered pits <br /> will be backfilled to two feet above groundwater exposure. If the Operator decides to mine below <br /> the groundwater horizon, a technical revision will be submitted to the Division to address ground <br /> water handling. <br /> No explosives will be used in conjunction with the mining and reclamation operation. <br /> DMR <br /> April 2018 D-2 <br />