Laserfiche WebLink
April 10, 2018 C-1980-004/McClane Canyon Mine CCW <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 0 <br />Number of Complete Inspections this Fiscal Year: 4 <br /> <br /> Page 3 of 7 <br /> <br />previous to the inspection. <br /> <br />T he sediment pond had a small puddle of water in it during the inspection (Photo 3). The level of the water <br />impounded had not reached the level of the primary spillway. The embankments of the pond were well vegetated <br />and stable. There were no indications of erosion or critter burrows at the pond. <br />The Portal Facilities area was in good repair. Evidence of recent flow was seen on the site, no major issues were <br />noted. There was a rill on the Portal facilities bench on the access road leading under the conveyor (Photo 4). <br />Please repair this rill to prevent expansion during spring precipitation events. <br /> <br /> <br />Photo 1: The debris located in the north haul road <br />ditch. <br /> <br />Photo 2: The Salt Creek Sump was holding water and <br />functioning as designed. The silt fence needs repairs. <br /> <br />Photo 3: The sediment Pond was nearly dry. <br /> <br />Photo 4: The rill located on the access road on the <br />portal facilities bench.