Laserfiche WebLink
6.1.2 The Lowell Pit site, which is located in the SE '/4 of Section 7, T.3S., <br /> R.68W., of the 6th P.M. The plan provided for the augmentation of assumed depletions from the <br /> future irrigation of 5.5 acres in the vicinity of the Lowell Pit which was being back-filled as part <br /> of reclamation. <br /> 6.1.3 The Golden Quarry, a/k/a Spec Agg Quarry, which is located in the N '/2 <br /> Section 15, and the S '/2 SE '/4 Section 10, TAS., R.70W., of the 6th P.M. The Consolidated <br /> Decree augmented the use of water at the Spec Agg Quarry for dust suppression and evaporation <br /> from a small sediment pond, and from a projected future washed-aggregate processing facility. <br /> 6.1.4 Heritage Square, a commercial shopping and amusement park facility, <br /> which is located in the N %2 of Section 15 and the S %2 of Section 10, TAS., R.70W., of the 6th <br /> P.M. As stated in the Consolidated Decree, five tributary wells on the property provided water <br /> to irrigate turf grass and landscaping, fill two small water ponds and supply drinking and sanitary <br /> water. Included within the Heritage Square property under the Consolidated Decree is the Magic <br /> Mountain Reservoir, which the Consolidated Decree recites was intended to be enlarged, and <br /> Magic Mountain Reservoir was in fact decreed to an enlarged capacity of 147 acre-feet in Case <br /> No. 99CW093. The Consolidated Decree allocated augmentation water to replace evaporation <br /> from the Magic Mountain Dam and Reservoir. <br /> 6.1.5 The water requirements of these existing and projected uses were <br /> estimated in a table presented at page 13 of the Consolidated Decree as 117.2 acre feet per year. <br /> Of that amount, 102.3 acre feet of water per year were projected to be depleted. See pp. 13-15 of <br /> Consolidated Decree. <br /> 6.1.6 The date of appropriation for the storage water rights, and exchanges in <br /> the Consolidated Decree is December 28, 1990. <br /> 6.2 Amendment to Structures to be Augmented <br /> By this Application, Martin Marietta, the successor in interest to the Spec Agg Quarry, <br /> Heritage Square, the Changed Water Rights and the Consolidated Decree, seeks to amend the <br /> structures for which augmentation under the Consolidated Decree is provided, as follows: <br /> 6.2.1 Spec Agg Facility/Magic Mountain Reservoir and Spec Agg Pit <br /> Martin Marietta will continue to use water stored in Magic Mountain Reservoir for <br /> industrial uses at the Spec Agg Quarry and to replace water used at its Spec Agg Quarry as <br /> provided for in the Consolidated Decree. It will also store water in the Spec Agg Pit for these <br /> purposes. Depletions at the Spec Agg Quarry include net evaporation from Magic Mountain <br /> Reservoir and the Spec Agg Pit and from the exposed surface area of several sediment retention <br /> ponds, as well as operational losses from dust control and concrete batching and other industrial <br /> uses associated with the property. Evaporation losses from the exposed water surface area of the <br /> ponds at the Spec Agg Quarry, Spec Agg Pit and Magic Mountain Reservoir shall be calculated <br /> Judgment and Decree <br /> Application of Martin Marietta Materials,Case No. 13CW3053 <br /> Page 5 <br />