Laserfiche WebLink
C-1981-044 RN7 <br />Page 4 <br />4/6/2018 <br />13. Rule 2.07.7(9) requires continuous, uninterrupted bond coverage at all times and an adequate <br />bond amount must be maintained pursuant to the requirements of Rule 3.02.2. The cover letter <br />to MR55 indicates that at the time of closing of the sale, a revised bond will be submitted. A new <br />Performance Bond will need to be submitted by the operator and approved by the Division. <br />Item Resolved: No longer applicable, sale did not occur, and MR -55 was withdrawn <br />2.05.3 Operation Plan/Permit Area <br />14. Please re-evaluate the mine facilities as described in section 2.05 of the permit, listed in Table 56, <br />and Shown on Maps 25 and 26. Those facilities not being maintained and not intended for future <br />mining or related operations need to be reclaimed in accordance with the approved reclamation <br />plan. <br />The Division understand that through currently occurring reclamation, some building have already been <br />removed while others may be requested to become permanent structures with upcoming revisions. <br />Please update the PAP with those revisions. <br />Rule: 4.05.2(5) Sediment Pond Construction <br />Sediment Pond designs are found in Exhibit 18 of the permit document. This exhibit comprises numerous <br />drawings, SedCad runs and summary information. The reclamation plan (Section 2.05.4) of the permit <br />addresses sediment pond maintenance. The ponds are designed to handle a 10 -year 24-hour event as <br />required by this rule. <br />This section of the rules is adequately addressed in the permit with the exception of: <br />15. Exhibit 18 states that during a pond evaluation by Leonard Rice Consulting Water Engineers, Inc., <br />it was not possible to determine the volume and detention time of ponds 9-132 and 9-P3. Please <br />provide this information or indicate where in the permit this information can be found. <br />16. For all existing ponds please update the pond summary information on page 22 of Exhibit 18 to <br />provide information on: <br />a. Crest Elevation <br />b. Spillway Crest Elevation <br />