Laserfiche WebLink
Eipvi* roipeiot, li)C. <br /> LARRY E.O'BRIAN 7985 VANCE DRIVE,SUITE 205A <br /> FOUNDER ARVADA,COLORADO 80003 <br /> STEVAN L.O'BRIAN 303-423.7297 <br /> PRESIDENT FAX 303-423-7699 <br /> April 5, 2018 RvIV " - <br /> Mr. Jared Ebert APR 0 G Z01g <br /> Division of Reclamation, Mining and Safety DIVISION OFRECLAW,, <br /> 1313 Sherman St, Suite 215 UNDO AND UFEi r <br /> Denver, CO 80203 <br /> Dear Jared: <br /> Re: Albert Frei and Sons, Inc . - Priola Pit <br /> Permit # M-2007-0879 - Adequacy Response #1 <br /> On behalf of our client Albert Frei and Sons, Inc . , I will <br /> respond to your March 28, 2018 , TR02 adequacy review letter in the <br /> order and number format presented in that document . I have added <br /> each point to be addressed from your letter so when reviewing our <br /> response one does not have to keep referring back to the original <br /> adequacy letter. <br /> 1 . The cover letter submitted with TR02 indicates that <br /> reclamation must commence by April 20, 2019 based on the <br /> approval of Technical Revision No. 1 (TR01) . The DRMS <br /> approval letter for TR01 dated March 22, 2016 extended the <br /> deadline to complete all phases of reclamation by April 20 , <br /> 2019 . Given this, please acknowledge that all phases of <br /> reclamation including backfilling, grading, topsoiling and <br /> seeding must be completed by April 20, 2019 . <br /> Albert Frei and Sons, Inc. will confirm that all phases of reclamation including backfilling, <br /> grading, topsoiling and seeding will be completed by April 20, 2019. <br /> 2 . The current reclamation plan required AFS to salvage and <br /> stockpile 15, 600 cubic yards of growth medium. During the <br /> Division' s June 26, 2017 inspection, soil stockpiles were <br /> observed on the site and these piles are labeled on the <br /> current conditions map and the proposed reclamation plan map <br /> submitted with TR02 . The cover letter with TR02 indicates AFS <br /> will import growth medium sufficient to place 6" of material <br /> over the entire disturbed area. Please clarify, will AFS use <br /> the current soil piles on site for reclamation? Will the <br /> imported growth medium be used in addition to onsite <br /> material? <br /> The current soil stockpiles on site will be used for reclamation and the importation of off <br /> site growth medium will supplement the onsite material to meet the 6 inch commitment. <br />