Laserfiche WebLink
Page 14 of 32 <br />Truck Bed (volume) Basis: <br />Struck Volume: <br />8.00 <br />LCY <br />Heaped Volume: <br />10.00 <br />LCY <br />Average Volume: <br />9.00 <br />LCY <br />Adjusted Volume: <br />10.00 <br />LCY <br />Final Truck Volume Based on Number of Loader Passes: 9.24 LCY <br />Loading Tool Capacity <br />Bucket Size Class: Large <br />Rated Capacity: 3.330 LCY (heaped) <br />Bucket Fill Factor: 0.925 Loose material - 1/8" to 3/8" 90 - 95% 0.925 <br />Adjusted Capacity: 3.080 LCY <br />Job Condition Corrections: Site Altitude (ft.): 5600 feet <br />Truck Loader Source <br />Altitude Adj: 1.000 1.000 (CAT HB) <br />Job Efficiency: 0.830 0.830 (CAT HB) <br />Net Correction: 0.830 0.830 <br />Loading Tool Cycle Time: Number of Loading Tool Passes Required to Fill <br />Excavators and Front Shovels: Truck: <br />Machine Cycle Time vs. Job Condition Rating: AVERAGE <br />Selected Value within this Basic Rating: AVERAGE <br />Track Loaders — Material Description: <br />Cycle Time Elements (min.): <br />Load: NA Maneuver: NA Dump: 0.10( <br />Wheel and Track Loaders - Unadjusted Basic Loader Cycle Time (load, dump, maneuver): <br />3 passes <br />NA minutes <br />Cycle Time Factors <br />Adjusted for site altitude: <br />Factor (min.) <br />Source <br />Material: <br />NA <br />NA <br />(Cat HB) <br />Stockpile: <br />NA <br />NA <br />(Cat HB) <br />Truck Ownership: <br />NA <br />NA <br />(Cat HB) <br />Operation: <br />NA <br />NA <br />(Cat HB) <br />Dump Target: <br />NA <br />NA <br />(Cat HB) <br />Truck Cycle Time: <br />Truck Exchange Time: 0.50 <br />Truck Load Time: 0.742 <br />Truck Maneuver and Dump Time: 0.80 <br />Truck Travel (Haul & Return) Time: <br />enetration 5.0 <br />Net Cycle Time Adjustment: <br />Adjusted Loader Cycle Time: <br />Net Load Time per Truck: <br />NA minutes <br />0.321 minutes <br />0.742 minutes <br />Minutes <br />Adjusted for site altitude: <br />0.500 <br />Minutes <br />Minutes <br />Adjusted for site altitude: <br />0.742 <br />Minutes <br />Minutes <br />Adjusted for site altitude: <br />0.800 <br />Minutes <br />Road Condition: Rutted dirt, little maintenance, no water, 2" tire <br />CIRCES Cost Estimating Software <br />