Laserfiche WebLink
Page 13 of 32 <br />TRUCK/LOADER TEAM WORK <br />Task description: Replace Topsoil From Stockpile to Refuse Pile <br />Site: Munger Canyon Mine Permit Action: RN7 Permit/Job#: C1981020 <br />PROJECT IDENTIFICATION <br />Task #: 034 State: Colorado <br />Date: 3/26/2018 County: Garfield <br />User: JHB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Truck Loader Team -Truck: Generic 8-10 cy, 6x4 <br />-Loader: Cat 336D L 10'-6" Stick <br />Support Equipment -Load Area: <br />-Dump Area: <br />Road Maintenance —Motor Grader: <br />-Water Truck: <br />NA <br />NA <br />NA <br />NA <br />Abbreviation: None <br />Filename: CO20-034 <br />Shift basis: 1 per day <br />Cost Breakdown: Truck/Loader Team Sunnort Eauinment Maintenance Eauinment <br />Total work team cost/hour: $253.34 <br />MATERIAL OUANTITIES <br />Initial volume: 7 CCY Swell factor: 1.125 <br />Loose volume: 8 LCY <br />Source of estimated volume: Opertor Estimate, Technical Revision 22 <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Pa. l�weight) Basis: <br />Material weight: 2,550 Pounds/LCY <br />Description: Earth - Dry packed <br />Rated Payload: 27,280 Pounds <br />Payload Capacity: 10.70 LCY <br />CIRCES Cost Estimating Software <br />Truck <br />Excavator <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization -machine: <br />100 <br />95 <br />NA <br />NA <br />NA <br />NA <br />Ownership cost/hour: <br />$27.37 <br />$46.82 <br />NA <br />NA <br />NA <br />NA <br />Operating cost/hour: <br />$32.23 <br />$49.53 <br />NA <br />NA <br />NA <br />NA <br />%Utilization -riper: <br />NA <br />0 <br />NA <br />NA <br />NA <br />NA <br />Ripper own. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />NA <br />NA <br />NA <br />NA <br />Operator cost/hour: <br />$0.00 <br />$37.79 <br />NA <br />NA <br />NA <br />NA <br />Unit Subtotals: <br />$59.60 <br />$134.14 <br />NA <br />NA <br />NA <br />NA <br />Number of Units: <br />2 <br />1 <br />0 <br />0 <br />0 <br />0 <br />Group Subtotals: <br />Work: $253.34 <br />Support: $0.00 <br />Maint: $0.00 <br />Total work team cost/hour: $253.34 <br />MATERIAL OUANTITIES <br />Initial volume: 7 CCY Swell factor: 1.125 <br />Loose volume: 8 LCY <br />Source of estimated volume: Opertor Estimate, Technical Revision 22 <br />Source of estimated swell factor: Cat Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Pa. l�weight) Basis: <br />Material weight: 2,550 Pounds/LCY <br />Description: Earth - Dry packed <br />Rated Payload: 27,280 Pounds <br />Payload Capacity: 10.70 LCY <br />CIRCES Cost Estimating Software <br />